{"id":2376,"date":"2018-10-08T12:17:55","date_gmt":"2018-10-08T08:47:55","guid":{"rendered":"https:\/\/www.peymabargh.com\/project\/hv-substation\/"},"modified":"2024-10-25T18:36:53","modified_gmt":"2024-10-25T15:06:53","slug":"power-transmission-lines-projects","status":"publish","type":"page","link":"https:\/\/www.peymabargh.com\/en\/power-transmission-lines-projects\/","title":{"rendered":"Power Transmission Lines (underground, air)"},"content":{"rendered":"<h2 style=\"text-align: left;\"><strong>Power Transmission Lines (underground, air)<\/strong><\/h2>\n<h3 style=\"text-align: left;\"><strong>Power Transmission Lines\u2019 Projects<\/strong><\/h3>\n<p style=\"text-align: left;\">In this section, some of the <strong>power transmission line projects<\/strong> of <a href=\"https:\/\/www.peymabargh.com\/en\"><strong>Peymabargh<\/strong><\/a> Company, including <strong>Power transmission lines<\/strong> and <strong>ground transmission cable lines<\/strong>,<\/p>\n<p style=\"text-align: left;\">which have been implemented since 1375, are introduced.<\/p>\n<p style=\"text-align: left;\">The <strong>Power Transmission Lines<\/strong> are definitely one of the most important parts of power supply network,<\/p>\n<p style=\"text-align: left;\">to transport produced electricity from the sources to consumption centers and link between provinces and the most important consumption centers.<\/p>\n<p style=\"text-align: left;\">As it\u2019s an important matter, huge section of the power industry\u2019s attention and investment is on renovation and maintenance of transmission and distribution.<\/p>\n<p style=\"text-align: left;\">In order to do that, <strong>Peymabargh<\/strong> Company has conducted several projects about design,<\/p>\n<p style=\"text-align: left;\">supply of equipment and Construction of air transmission lines of 63 to 400 kV,<\/p>\n<p style=\"text-align: left;\">design, supply of equipment and complete construction of underground cable power transmission lines of 63 to 230 kV and<\/p>\n<p style=\"text-align: left;\">transmission lines\u2019 wiring from the existing power transmission lines without power outage.<\/p>\n<h3 style=\"text-align: left;\"><strong>Underground and air transmission networks<\/strong><\/h3>\n<p style=\"text-align: left;\">The importance of electrical energy transmission for the greater efficiency of industries is undeniable.<\/p>\n<p style=\"text-align: left;\">Due to the network capacity and, of course, in the development path, Iran has an increasing need to build<\/p>\n<p style=\"text-align: left;\">air transmission lines up to 800 kV.<\/p>\n<p style=\"text-align: left;\"><strong>Peymabargh<\/strong> Company has so far been able to fully implement the above distribution or transmission lines up to 400 kV.<\/p>\n<p style=\"text-align: left;\">Also, providing technical and engineering services in the field of mapping, road construction, foundation construction and<\/p>\n<p style=\"text-align: left;\">construction and installation of transmission and wiring towers on a case-by-case basis in infrastructure projects is part of<\/p>\n<p style=\"text-align: left;\">the diverse portfolio of services in this field<strong>.<\/strong><\/p>\n<p style=\"text-align: left;\">Also, with the expansion of high-strength underground cable lines, <strong>Peymabargh<\/strong> Company, as one of the leading companies,<\/p>\n<p style=\"text-align: left;\">has been able to engineer equipment supply and cabling in accordance with the latest methods up to 230 kV.<\/p>\n<p>&nbsp;<\/p>\n<h3 style=\"text-align: left;\"><strong>Power Transmission Lines projects (air)<\/strong><\/h3>\n<table class=\" alignleft\">\n<tbody>\n<tr>\n<td width=\"316\">Project Name<\/td>\n<td width=\"261\">Client<\/td>\n<td width=\"46\">Rows<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Installation of tower and wiring of 400 kV line line-Jalal-North Rey<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">1<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Installation of tower for 400 kV line Karaj-Kan<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">2<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Wiring of 400 kV-Tabriz-Goglan<\/td>\n<td width=\"261\">Azerbaijan Regional Electric Company<\/td>\n<td width=\"46\">3<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Wiring of 400 kV line -Jalal-Golpayegan<\/td>\n<td width=\"261\">Isfahan Regional Electric Company<\/td>\n<td width=\"46\">4<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Installation of tower and wiring of 400\/63 kV line Karaj-Kan<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">5<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Installation of tower and wiring of 400\/63 kV line of Saadat Abad Forest Park<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">6<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Construction of 400\/63 kV line Zob Ahan Isfahan-Tiran<\/td>\n<td width=\"261\">Zob Ahan Isfahan Company<\/td>\n<td width=\"46\">7<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Constructing the foundation of 400 kV line Golpayegan-Godarlander<\/td>\n<td width=\"261\">Power Development Organization<\/td>\n<td width=\"46\">8<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Constructing the foundation of 400 kV line Omidieh-Chaghadak<\/td>\n<td width=\"261\">Power Development Organization<\/td>\n<td width=\"46\">9<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 400 kV power line Roodshoor power plant<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">10<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Installation of towers for 400 kV lone Eskol Dareh-Vardavard<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">11<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Wiring of 400 kV power line Mashhad-Sarakhs<\/td>\n<td width=\"261\">Power Development Organization<\/td>\n<td width=\"46\">12<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Wiring of 400 kV power line Sabzevar-Shahrood<\/td>\n<td width=\"261\">Semnan Regional Electric Company<\/td>\n<td width=\"46\">13<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 400 kV power line Jalal-Neka-Ahovan<\/td>\n<td width=\"261\">Mazandaran Regional Electric Company<\/td>\n<td width=\"46\">14<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Constructing the foundation of 400 kV power line foundation Firoozkooh<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">15<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Wiring of 400 kV power line Bafgh-Tabas<\/td>\n<td width=\"261\">Yazd Regional Electric Company<\/td>\n<td width=\"46\">16<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 230 kV power line North Rey-Doshan Tapeh<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">17<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Wiring of 230 kV power line Montazer Ghaem-Maanavi<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">18<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Wiring of 230 kV power line-Ghale Hassan Khan<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">19<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Wiring of 230 kV power line Azimieh-Vardavard<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">20<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Constructing the foundation of 230 kV power line foundation- Forest Park-Azimieh_Karaj<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">21<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 230 kV power line Chabahar-Jakigor<\/td>\n<td width=\"261\">Power Engineering Consultant Co. (Moshanir)<\/td>\n<td width=\"46\">22<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 230 kV power line Pardis<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">23<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 230 kV power line Sarpol Zahab-Khosravi<\/td>\n<td width=\"261\">West Regional Electric Company<\/td>\n<td width=\"46\">24<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Constructing the foundation of 230 kV power line Ilam-Simreh<\/td>\n<td width=\"261\">West Regional Electric Company<\/td>\n<td width=\"46\">25<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Constructing the foundation of 230 kV power line Cheshmeh Sefid-Oramanat<\/td>\n<td width=\"261\">West Regional Electric Company<\/td>\n<td width=\"46\">26<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 230 kV power line Lavarak Hydropower<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">27<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 63 kV power line Montazer Ghaem Andisheh<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">28<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Tower installation and wiring 63 kV power line Qom 1-Qom 2<\/td>\n<td width=\"261\">Qom Regional Electric Company<\/td>\n<td width=\"46\">29<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Wiring 63 kV power line Charmshahr-Gharchak-Andisheh<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">30<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 63 kV power line Eshtehard<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">31<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 63 kV power line Southeast<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">32<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 63 kV power line Takestan-Nekoyieh<\/td>\n<td width=\"261\">Zanjan Regional Electric Company<\/td>\n<td width=\"46\">33<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Wiring of 63 kV power line Sanandaj-Marivan<\/td>\n<td width=\"261\">West Regional Electric Company<\/td>\n<td width=\"46\">34<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 63 kV power line Parandak-Shams Abad Industrial Estate<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">35<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 63 kV power line Sarooj Cement<\/td>\n<td width=\"261\">Sarooj Cement Company<\/td>\n<td width=\"46\">36<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 63 kV power line-Farokhshahr<\/td>\n<td width=\"261\">Isfahan Regional Electric Company<\/td>\n<td width=\"46\">37<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Design and topography of 132 kV power line Mansouri-Sarbandar<\/td>\n<td width=\"261\">Sakhtar Farda Company<\/td>\n<td width=\"46\">38<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 63 kV power line-Varamin<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">39<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 63 kV power line Eslamshahr-Chardangeh<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">40<\/td>\n<\/tr>\n<tr>\n<td width=\"316\">Full construction of 63 kV power line-Shahriar<\/td>\n<td width=\"261\">Tehran Regional Electric Company<\/td>\n<td width=\"46\">41<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<h3 style=\"text-align: left;\"><strong>Underground Transmission lines projects<\/strong><\/h3>\n<table class=\" alignleft\">\n<tbody>\n<tr>\n<td width=\"293\">Project Name<\/td>\n<td width=\"283\">Client<\/td>\n<td width=\"47\">Rows<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Double circuit 63 kV substation Sohrevardi<\/td>\n<td width=\"283\">Tehran Regional Electric Company<\/td>\n<td width=\"47\">1<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Cabling of double circuit 63 kV substation Ghoorkhaneh-Zahiroleslam<\/td>\n<td width=\"283\">Tehran Regional Electric Company<\/td>\n<td width=\"47\">2<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Cabling of four circuit 63 kV substation Gheitarieh-Elahieh<\/td>\n<td width=\"283\">Tehran Regional Electric Company<\/td>\n<td width=\"47\">3<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Cabling of double circuit 63 kV substation Gheitarieh-Tajrish<\/td>\n<td width=\"283\">Tehran Regional Electric Company<\/td>\n<td width=\"47\">4<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Cabling of six circuit 63 kV substation Resalat<\/td>\n<td width=\"283\">Tehran Regional Electric Company<\/td>\n<td width=\"47\">5<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Cabling of six circuit 63 kV substation Montazer Ghaem<\/td>\n<td width=\"283\">Tehran Regional Electric Company<\/td>\n<td width=\"47\">6<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Cabling of double circuit 63 kV substation Seyed Kandan<\/td>\n<td width=\"283\">Tehran Regional Electric Company<\/td>\n<td width=\"47\">7<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Cabling of double circuit 63 kV substation Azadegan-Mortazavi<\/td>\n<td width=\"283\">Tehran Regional Electric Company<\/td>\n<td width=\"47\">8<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Cabling of six circuit 63 kV substation Resalat<\/td>\n<td width=\"283\">Tehran Regional Electric Company<\/td>\n<td width=\"47\">9<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Cabling of double circuit 63 kV substation Zafar-Haghani<\/td>\n<td width=\"283\">Tehran Regional Electric Company<\/td>\n<td width=\"47\">10<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Cabling of double circuit 63 kV substation Shoosh-Khorasan<\/td>\n<td width=\"283\">Tehran Regional Electric Company<\/td>\n<td width=\"47\">11<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Cabling of double circuit 63 kV line Ghorkhaneh-Farabi<\/td>\n<td width=\"283\">Tehran Regional Electric Company<\/td>\n<td width=\"47\">12<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Cabling of double circuit 63 kV line Ghorkhaneh-Bahar<\/td>\n<td width=\"283\">Tehran Regional Electric Company<\/td>\n<td width=\"47\">13<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Cabling of double circuit 63 kV line Karaj1 and Karaj2<\/td>\n<td width=\"283\">Tehran Regional Electric Company<\/td>\n<td width=\"47\">14<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Cabling of double circuit 63 kV line Tehranpars-University of Science and Technology<\/td>\n<td width=\"283\">Tehran Urban and Suburban Railway Co.<\/td>\n<td width=\"47\">15<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Cabling of double circuit 63 kV line University of Science and Technology<\/td>\n<td width=\"283\">Tehran Urban and Suburban Railway Co.<\/td>\n<td width=\"47\">16<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Cabling of double circuit 63 kV line Shoosh-Molavi<\/td>\n<td width=\"283\">Tehran Regional Electric Company<\/td>\n<td width=\"47\">17<\/td>\n<\/tr>\n<tr>\n<td width=\"293\">Full construction of 63 kV line Shahriar<\/td>\n<td width=\"283\">Tehran Regional Electric Company<\/td>\n<td width=\"47\">18<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Power Transmission Lines (underground, air) Power Transmission Lines\u2019 Projects In this &#8230; <\/p>\n","protected":false},"author":281,"featured_media":2377,"parent":0,"menu_order":4,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-2376","page","type-page","status-publish","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.4 (Yoast SEO v24.5) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Power Transmission Lines (underground, air) - \u067e\u06cc\u0645\u0627\u0628\u0631\u0642<\/title>\n<meta name=\"description\" content=\"In this section, some of the power transmission line projects of Peymabargh Company, including Power transmission lines and ground transmission cable lines,\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.peymabargh.com\/hv-substation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Power Transmission Lines (underground, air)\" \/>\n<meta property=\"og:description\" content=\"In this section, some of the power transmission line projects of Peymabargh Company, including Power transmission lines and ground transmission cable lines,\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.peymabargh.com\/hv-substation\/\" \/>\n<meta property=\"og:site_name\" content=\"\u067e\u06cc\u0645\u0627\u0628\u0631\u0642\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-25T15:06:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.peymabargh.com\/wp-content\/uploads\/2017\/01\/peymabargh-img.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"575\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.peymabargh.com\/hv-substation\/\",\"url\":\"https:\/\/www.peymabargh.com\/hv-substation\/\",\"name\":\"Power Transmission Lines (underground, air) - \u067e\u06cc\u0645\u0627\u0628\u0631\u0642\",\"isPartOf\":{\"@id\":\"https:\/\/www.peymabargh.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.peymabargh.com\/hv-substation\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.peymabargh.com\/hv-substation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.peymabargh.com\/wp-content\/uploads\/2017\/01\/peymabargh-img.jpg\",\"datePublished\":\"2018-10-08T08:47:55+00:00\",\"dateModified\":\"2024-10-25T15:06:53+00:00\",\"description\":\"In this section, some of the power transmission line projects of Peymabargh Company, including Power transmission lines and ground transmission cable lines,\",\"breadcrumb\":{\"@id\":\"https:\/\/www.peymabargh.com\/hv-substation\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.peymabargh.com\/hv-substation\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.peymabargh.com\/hv-substation\/#primaryimage\",\"url\":\"https:\/\/www.peymabargh.com\/wp-content\/uploads\/2017\/01\/peymabargh-img.jpg\",\"contentUrl\":\"https:\/\/www.peymabargh.com\/wp-content\/uploads\/2017\/01\/peymabargh-img.jpg\",\"width\":575,\"height\":768,\"caption\":\"\u062e\u0637\u0648\u0637 \u0627\u0646\u062a\u0642\u0627\u0644 \u0646\u064a\u0631\u0648 (\u0632\u0645\u064a\u0646\u0649\u060c\u0647\u0648\u0627\u064a\u0649)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.peymabargh.com\/hv-substation\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0635\u0641\u062d\u0647 \u062e\u0627\u0646\u06af\u06cc\",\"item\":\"https:\/\/www.peymabargh.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Power Transmission Lines (underground, air)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.peymabargh.com\/#website\",\"url\":\"https:\/\/www.peymabargh.com\/\",\"name\":\"\u067e\u06cc\u0645\u0627\u0628\u0631\u0642\",\"description\":\"\u0627\u062d\u062f\u0627\u062b \u062e\u0637\u0648\u0637 \u0648 \u067e\u0633\u062a \u0647\u0627\u06cc \u0628\u0631\u0642 \u0648 \u0634\u0628\u06a9\u0647 \u0647\u0627\u06cc \u062a\u0648\u0632\u06cc\u0639 \u0648 \u0641\u06cc\u0628\u0631 \u0646\u0648\u0631\u06cc\",\"publisher\":{\"@id\":\"https:\/\/www.peymabargh.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.peymabargh.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.peymabargh.com\/#organization\",\"name\":\"\u067e\u06cc\u0645\u0627\u0628\u0631\u0642\",\"url\":\"https:\/\/www.peymabargh.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.peymabargh.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.peymabargh.com\/wp-content\/uploads\/2024\/10\/logo-peymabargh-farsi.png\",\"contentUrl\":\"https:\/\/www.peymabargh.com\/wp-content\/uploads\/2024\/10\/logo-peymabargh-farsi.png\",\"width\":891,\"height\":222,\"caption\":\"\u067e\u06cc\u0645\u0627\u0628\u0631\u0642\"},\"image\":{\"@id\":\"https:\/\/www.peymabargh.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/instagram.com\/peymabargh\",\"https:\/\/www.linkedin.com\/company\/peymabargh\/\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Power Transmission Lines (underground, air) - \u067e\u06cc\u0645\u0627\u0628\u0631\u0642","description":"In this section, some of the power transmission line projects of Peymabargh Company, including Power transmission lines and ground transmission cable lines,","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.peymabargh.com\/hv-substation\/","og_locale":"en_US","og_type":"article","og_title":"Power Transmission Lines (underground, air)","og_description":"In this section, some of the power transmission line projects of Peymabargh Company, including Power transmission lines and ground transmission cable lines,","og_url":"https:\/\/www.peymabargh.com\/hv-substation\/","og_site_name":"\u067e\u06cc\u0645\u0627\u0628\u0631\u0642","article_modified_time":"2024-10-25T15:06:53+00:00","og_image":[{"width":575,"height":768,"url":"https:\/\/www.peymabargh.com\/wp-content\/uploads\/2017\/01\/peymabargh-img.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.peymabargh.com\/hv-substation\/","url":"https:\/\/www.peymabargh.com\/hv-substation\/","name":"Power Transmission Lines (underground, air) - \u067e\u06cc\u0645\u0627\u0628\u0631\u0642","isPartOf":{"@id":"https:\/\/www.peymabargh.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.peymabargh.com\/hv-substation\/#primaryimage"},"image":{"@id":"https:\/\/www.peymabargh.com\/hv-substation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.peymabargh.com\/wp-content\/uploads\/2017\/01\/peymabargh-img.jpg","datePublished":"2018-10-08T08:47:55+00:00","dateModified":"2024-10-25T15:06:53+00:00","description":"In this section, some of the power transmission line projects of Peymabargh Company, including Power transmission lines and ground transmission cable lines,","breadcrumb":{"@id":"https:\/\/www.peymabargh.com\/hv-substation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.peymabargh.com\/hv-substation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.peymabargh.com\/hv-substation\/#primaryimage","url":"https:\/\/www.peymabargh.com\/wp-content\/uploads\/2017\/01\/peymabargh-img.jpg","contentUrl":"https:\/\/www.peymabargh.com\/wp-content\/uploads\/2017\/01\/peymabargh-img.jpg","width":575,"height":768,"caption":"\u062e\u0637\u0648\u0637 \u0627\u0646\u062a\u0642\u0627\u0644 \u0646\u064a\u0631\u0648 (\u0632\u0645\u064a\u0646\u0649\u060c\u0647\u0648\u0627\u064a\u0649)"},{"@type":"BreadcrumbList","@id":"https:\/\/www.peymabargh.com\/hv-substation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0635\u0641\u062d\u0647 \u062e\u0627\u0646\u06af\u06cc","item":"https:\/\/www.peymabargh.com\/en\/"},{"@type":"ListItem","position":2,"name":"Power Transmission Lines (underground, air)"}]},{"@type":"WebSite","@id":"https:\/\/www.peymabargh.com\/#website","url":"https:\/\/www.peymabargh.com\/","name":"\u067e\u06cc\u0645\u0627\u0628\u0631\u0642","description":"\u0627\u062d\u062f\u0627\u062b \u062e\u0637\u0648\u0637 \u0648 \u067e\u0633\u062a \u0647\u0627\u06cc \u0628\u0631\u0642 \u0648 \u0634\u0628\u06a9\u0647 \u0647\u0627\u06cc \u062a\u0648\u0632\u06cc\u0639 \u0648 \u0641\u06cc\u0628\u0631 \u0646\u0648\u0631\u06cc","publisher":{"@id":"https:\/\/www.peymabargh.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.peymabargh.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.peymabargh.com\/#organization","name":"\u067e\u06cc\u0645\u0627\u0628\u0631\u0642","url":"https:\/\/www.peymabargh.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.peymabargh.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.peymabargh.com\/wp-content\/uploads\/2024\/10\/logo-peymabargh-farsi.png","contentUrl":"https:\/\/www.peymabargh.com\/wp-content\/uploads\/2024\/10\/logo-peymabargh-farsi.png","width":891,"height":222,"caption":"\u067e\u06cc\u0645\u0627\u0628\u0631\u0642"},"image":{"@id":"https:\/\/www.peymabargh.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/instagram.com\/peymabargh","https:\/\/www.linkedin.com\/company\/peymabargh\/"]}]}},"_links":{"self":[{"href":"https:\/\/www.peymabargh.com\/en\/wp-json\/wp\/v2\/pages\/2376","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.peymabargh.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.peymabargh.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.peymabargh.com\/en\/wp-json\/wp\/v2\/users\/281"}],"replies":[{"embeddable":true,"href":"https:\/\/www.peymabargh.com\/en\/wp-json\/wp\/v2\/comments?post=2376"}],"version-history":[{"count":0,"href":"https:\/\/www.peymabargh.com\/en\/wp-json\/wp\/v2\/pages\/2376\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.peymabargh.com\/en\/wp-json\/wp\/v2\/media\/2377"}],"wp:attachment":[{"href":"https:\/\/www.peymabargh.com\/en\/wp-json\/wp\/v2\/media?parent=2376"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}